- Published on
We arrived in Florida at Faith a week before Thanksgiving, which gave us time to catch up on some work around the church before heading to the west coast of the state to spend Thanksgiving with Dave’s sister Wendy and her family.
Thanksgiving Dinner . . . 1 , 2, 3, 4
Before leaving Faith to visit with Dave’s sister, we celebrated Thanksgiving twice. First after the Sunday service with a potluck dinner. And then again on Tuesday, we were invited to share in a Thanksgiving Potluck held by the English language class that meets each week. This 2nd meal was not your average Thanksgiving menu, but the dishes were as delicious as they were varied, and the tables were groaning with all of the food being shared. Those were Thanksgiving meals number 1 and 2.
Before leaving Faith to visit with Dave’s sister, we celebrated Thanksgiving twice. First after the Sunday service with a potluck dinner. And then again on Tuesday, we were invited to share in a Thanksgiving Potluck held by the English language class that meets each week. This 2nd meal was not your average Thanksgiving menu, but the dishes were as delicious as they were varied, and the tables were groaning with all of the food being shared. Those were Thanksgiving meals number 1 and 2.
On Wednesday, we made a leisurely trip across Florida from Jacksonville to Bradenton, where we would join Dave’s sister’s family for a Thanksgiving celebration. The gathering would take place on Friday as Dave and Wendy made a similar trip in the opposite direction on Thanksgiving Day to celebrate with their son’s family in Melbourne. This day’s highlight was an amazing BBQ meal at a small roadside stand called Southern Style Farmshack BBQ near Ocala.
Waking up north of Tampa on Thanksgiving Day, we had few plans until evening, but a text message from our friend Cheri changed all that. She and Butch were volunteering in Tampa and had no dinner plans until late afternoon. And they were only 45 minutes away in the direction of our travel. We had missed seeing them last year as he was getting treatments for cancer, so it was fun to see them both and especially to see him in good health.
They were in charge of the turkey and dressing for their shared meal. And Butch had a unique way of cooking their turkey. He placed in under a metal trash can with briquets on top and around the base. Less than 2 hours later, it was cooked and ready to eat. So, as they made ready to join their host for Thanksgiving dinner, we moved on south over the Skyway bridge toward Bradenton.
We knew that there would not be many restaurants open on Thanksgiving Day, so we checked Google to get a list of which ones might be open. Along route 70 near I75, there are dozens of restaurants within a few miles on either side of the interstate. Of all of those restaurants, despite what Google told us, only 1 was open. That was Bob Evans. Their usual menu was greatly simplified on this day. Other than breakfast, the choices were a turkey dinner, a ham dinner, or a combination turkey and ham dinner. We chose the latter and split it between us. That was Thanksgiving dinner number 3.
We met up with Wendy and Dave at their house a little later. Our next Thanksgiving celebration would take place the next day at our niece Janelle’s house. This meal was an amazing feast, and the meal was only part of the day’s festivities. There were games after dinner, including some nerf gun warfare outside with nephew Jack and his friend. That was Thanksgiving dinner number 4.
Before heading out on Friday for Janelle’s, Wendy and Dave’s neighbor invited themselves over for a Friendsgiving dinner on Saturday. They were supplying all the food, but since their kitchen was under construction, they needed Wendy to reheat it. So, Saturday afternoon, we gathered to enjoy Thanksgiving meal number 5.
On Sunday, we joined Wendy and Dave at church but spent the morning with Wendy and Jack at Sunday school. The kids were making Advent wreaths, and we were responsible for cutting out over 70 advent candles for them to glue onto their wreaths. By the time we were done, the class was almost over. But Wendy was given 5 minutes to do a run through of the Christmas pageant with the kids. And she was able to do just that. So, we had a little time to share a meal of – what else? --turkey and stuffing leftovers before heading out for Faith. All kidding aside, we had a great time together.
Back at Faith
We had about a little more than a week at Faith before Thanksgiving, and we tried to make the most of it. An ethernet cable in the Asbury Hall had been broken off in the wall over the summer. While there was plenty of slack on the opposite wall to make up the difference, this excess would have to be moved around the outside of the building down one side around the back and up the other side on a particularly hot day. Once the wire had enough slack restored, Cathy put a new end on it and the internet was restored in the building and for the campground in time for the Nomads arrival in January.
We had about a little more than a week at Faith before Thanksgiving, and we tried to make the most of it. An ethernet cable in the Asbury Hall had been broken off in the wall over the summer. While there was plenty of slack on the opposite wall to make up the difference, this excess would have to be moved around the outside of the building down one side around the back and up the other side on a particularly hot day. Once the wire had enough slack restored, Cathy put a new end on it and the internet was restored in the building and for the campground in time for the Nomads arrival in January.
In addition to the usual computer updates and internet problems, we were around to help with the Christmas decorations in the sanctuary as well. Dave took Adriana on a tour of the campground to help her understand the layout as requests are made for stays throughout the year. And we were asked to do some research into selling some of the work vehicles that were no longer needed.
Our presence in Jacksonville allowed us some in-person time to work with Pastor Jacop on securing the funding for his roof. And we could spend an afternoon with Beverly to address some of her computer issues while catching up. We also were in position to help Leslie with some of the preparations for the Nomads projects as the demands on her time were making this task difficult for her.
Parting Shot
These Sandhill Cranes were making their distinctive call as we took a walk around the lakes in Lakewood Ranch.
These Sandhill Cranes were making their distinctive call as we took a walk around the lakes in Lakewood Ranch.
- Published on
This was a whirlwind Cabin Work Week, with a smaller, more experienced team gathered in week 1 and many returning volunteers in week 2. We were unsure whether we could keep everyone busy as we moved people between sites and tasks throughout the 2 weeks, but we made it all work. After a final project dinner celebrating the 8 project years, we spent a few days tidying up the work sites before packing up to head south.
Rain, Rain, Go Away
When we saw the forecast for the first week of the project, all we could do was sigh. Rain was in the forecast 3 out of 5 days. This could be a problem. So, we held our breath and gathered on Monday to get to work. At least the 2nd week was going to be sunny and warm.
When we saw the forecast for the first week of the project, all we could do was sigh. Rain was in the forecast 3 out of 5 days. This could be a problem. So, we held our breath and gathered on Monday to get to work. At least the 2nd week was going to be sunny and warm.
Luckily, Monday’s rain wouldn’t arrive until overnight. That gave the roofers all day to ensure the cabin receiving a new composite roof would be protected. With the help of the park staff, the roof was stripped quickly. Then by lunch, the roof deck had been covered with a layer of ice shield which ensured the cabin was sealed against the elements no matter when the rain came. While almost 2/3 of the composite shingles were on by day’s end, it would take another couple of days to get the rest in place as the team dodged raindrops.
By the end of the 2nd week, another composite roof was done, plus an asphalt roof on "Joe's shed" behind the office.
By the end of the 2nd week, another composite roof was done, plus an asphalt roof on "Joe's shed" behind the office.
The painters managed to get all of the remaining decks in 3rd Branch stained on the first Monday, which was a good thing, because the weather moved them inside for the rest of the week. Three of the 3rd Branch cabins would benefit from the rain, since their interiors were all painted over the 2 weeks of the project. And those decks in the final cabin site, 2nd Branch, were finally able to be done in the 2nd week when the rain went away.
The screening team lead had some prep work to do in week 1, marking screens to be repaired or replaced and painting over 100 pieces of screen trim that would be needed. When the rest of the team arrived in week 2, all was ready to go.
The screening team had fewer screens to tackle than in a typical year, but the team was smaller as well, so the work and the team size seemed to line up well.
The screening team had fewer screens to tackle than in a typical year, but the team was smaller as well, so the work and the team size seemed to line up well.
The special projects team would be improving the 2 bathhouses in 2nd and 3rd Branch. This was a complicated logistical project, since we were discovering new supplies that were needed on an almost daily basis.
The biggest hurdle came in 2nd Branch, where a leaking pipe had damaged walls and required a new hot water heater. By the end of the 2nd week, both bathhouses had walls repaired, new fixtures, plumbing that had been updated and, in 2nd Branch, a new hot water heater. The spiders and crickets were upset, because they no longer had a cozy home inside. But you can’t please everybody.
The biggest hurdle came in 2nd Branch, where a leaking pipe had damaged walls and required a new hot water heater. By the end of the 2nd week, both bathhouses had walls repaired, new fixtures, plumbing that had been updated and, in 2nd Branch, a new hot water heater. The spiders and crickets were upset, because they no longer had a cozy home inside. But you can’t please everybody.
The Carpentry team was doing work in every site. During the rainy first week, they completed many of the inside tasks, including some significant floor repairs that had been tripping up campers and volunteers for decades. When the 4 closets in the cabins had been removed in years past, the floors underneath had never been made flush. By the end of week 1, all 12 remaining floor patches had been repaired.
As the weather warmed and dried out for the 2nd project week, work intensified with the addition of more team members. The damage in the Weyanock Lodge consumed the efforts of several carpenters for much of the week, along with the efforts of a few painters. There were also repairs to parking lot timbers chewed up by carpenter bees, and many small repairs throughout the remaining cabins.
Our main goal for the project was to transition the cabin maintenance to a team of local volunteers, the Timbersmiths. So, during the 2nd week, members of this group joined us one afternoon for training sessions at the work site, that seemed to be well-received by the trainees as well as the instructors.
You can check out this year’s project video below.
You can check out this year’s project video below.
Celebrating Time Together
The rain didn’t stop us from enjoying time off the clock. We had campfires, ranger talks, daily trivia, and, of course, archery. The Volunteer Appreciation event on the middle weekend had record attendance of all the park volunteers. Volunteers from all areas of the park were honored for exceptional service, from the trail “gnomes” to the gardeners to the concession workers and so much more. Among those honored were 2 of the Cabin Work Week team leads – Jim from Special Projects and Bill from the Roofing team.
The rain didn’t stop us from enjoying time off the clock. We had campfires, ranger talks, daily trivia, and, of course, archery. The Volunteer Appreciation event on the middle weekend had record attendance of all the park volunteers. Volunteers from all areas of the park were honored for exceptional service, from the trail “gnomes” to the gardeners to the concession workers and so much more. Among those honored were 2 of the Cabin Work Week team leads – Jim from Special Projects and Bill from the Roofing team.
To our surprise, we were also honored at this event with a beautiful plaque crafted one of the skilled Timbersmith volunteers, presented by the Director of Virginia State Parks, Melissa Baker. It recognized our leadership in the 8 project years of Cabin Work Week.
We received this photo with words of thanks on the night of the project dinner.
And, on the Friday after the last day of the project, we celebrated with a project dinner that brought together the team members, park staff and some of those who had been there at the beginning to get the whole thing started 8 years ago. Cathy’s sisters all came as well. We enjoyed Don’s famous Brunswick stew and a video that reflected on not just this year’s project, but the 8 project years that led up to it.
What Temp is it Now?
When we smoke a pork butt or brisket that takes a dozen hours or more, we like to cook it overnight. This can create a problem in getting sleep. Dave gets up every few hours to check on it, but this didn’t work so well when we tried it last September. A problem with the smoker caused it to shut down. When Dave made his next check, the smoker was not warm enough, causing us to question whether the meat had been compromised. To our dismay, we had to throw it out.
Not wanting this to happen again, Dave purchased a high quality remote meat thermometer called the RFX Meat Gateway. The package he chose came with 2 probes. One would be inserted in the meat to monitor its temperature and the other would sit inside the smoker to monitor the cooking temperature. He could set an alarm that would alert if the temperatures dropped too low or rose too high.
So, when we smoked our next pork butt for a project lunch, he put the new probes to the test. And they did the job. The smoker had an issue that Dave was alerted to in time to correct it. He also lost a little less sleep, and the pulled pork was a big hit. We also tried a new recipe for smoked baked beans which was equally popular.
When we smoke a pork butt or brisket that takes a dozen hours or more, we like to cook it overnight. This can create a problem in getting sleep. Dave gets up every few hours to check on it, but this didn’t work so well when we tried it last September. A problem with the smoker caused it to shut down. When Dave made his next check, the smoker was not warm enough, causing us to question whether the meat had been compromised. To our dismay, we had to throw it out.
Not wanting this to happen again, Dave purchased a high quality remote meat thermometer called the RFX Meat Gateway. The package he chose came with 2 probes. One would be inserted in the meat to monitor its temperature and the other would sit inside the smoker to monitor the cooking temperature. He could set an alarm that would alert if the temperatures dropped too low or rose too high.
So, when we smoked our next pork butt for a project lunch, he put the new probes to the test. And they did the job. The smoker had an issue that Dave was alerted to in time to correct it. He also lost a little less sleep, and the pulled pork was a big hit. We also tried a new recipe for smoked baked beans which was equally popular.
Traveling South
After a short (but very cold) post-week cleanup, we were packed up and ready to head south. Our first night was a quick stop at South of the Border. Then we drove another 150 miles south to spend the weekend at the Lake Jasper RV Village in Hardeeville SC near the Georgia border. With a Passport America discount, this was a great bargain. We had a convenient pull-through site in a lovely campground. But the big win was its proximity to the Sargent Jasper county park that had over 4 miles of wide, shaded trails that we enjoyed walking each day.
After a short (but very cold) post-week cleanup, we were packed up and ready to head south. Our first night was a quick stop at South of the Border. Then we drove another 150 miles south to spend the weekend at the Lake Jasper RV Village in Hardeeville SC near the Georgia border. With a Passport America discount, this was a great bargain. We had a convenient pull-through site in a lovely campground. But the big win was its proximity to the Sargent Jasper county park that had over 4 miles of wide, shaded trails that we enjoyed walking each day.
While they also had a disc golf course, we chose not to try our luck, since many of the holes were right next to ponds where alligators live. With our limited skills, we would surely lose most of our disks. And it did warm up enough that we saw at least one big gator on the move. No thanks.
On Monday, we covered the remaining miles to Jacksonville. where the RV would sit for a while.
On Monday, we covered the remaining miles to Jacksonville. where the RV would sit for a while.