Published on
Image description
As March came to a close, we were on a mission to finish up what we could since we would be heading out on our cruise in early April. Although we originally thought this would involve small tasks, that turned out to be far from reality. We found ourselves clearing a field of debris, painting the Wesley roof and helping with a fashion show to name just a few of our month-end projects. And then there was a dumpster fire. ​
Image description
It’s a Dumpster Fire
​
​It had been an exhausting day. Despite several days of work by a contractor, the field next to the campground still had much more clearing to be done. So, the church trustees decided the remaining work could be handled with a few of us working with a Bobcat. The aging playground equipment needed to be pulled down and cut up, the remaining debris needed to be collected and put in a dumpster, and the metal sent to recycling. Dave and I joined 2 Trustees – Mike and Sandy – a worker from First 90, and fellow volunteer Sandy to pick up, dig up, and cut up the swingsets, jungle gyms, and other structures left standing. We were largely done by 4 and more than ready to take a break.
Image description
​Done for the day, Cathy cleaned up and went to a Circle Meeting and Dave took his leave as Mike and Sandy stayed behind to do a few more things before stopping for the day. It was around 6:30 when the call came in. Did you know your dumpster is on fire? Really? Dave took off for the field, grabbing a couple of buckets on the way. Cathy headed to the carport to get the golf cart and more buckets to put water on the fire. While she was filling the buckets with water, Dave called. He had arrived to see large flames rising from the dumpster. With the closest water source 50 ft away, he could only get so much water on the fire with buckets. It was time to call the Fire Department. 
Image description
Cathy made the 911 call describing the field’s location without knowing its exact address. “It’s between 3920 and 4000”. Once hanging up with 911, she drove over to the field and saw what Dave was dealing with. She dumped her buckets of water on the fire and then the golf cart was employed to move the water back and forth. But all we were doing was keeping it from getting much worse. ​
Image description
It was thankfully not long before the fire trucks arrived and the professionals took over. Apparently others had seen the fire from I95 and called it in as well. The firefighters had to haul their hose over 100 feet to get water and foam on the fire, and even ended up calling a 2nd truck. After about an hour, the fire was out to their satisfaction, and they were heading out. If we had been tired before, we were exhausted now. We kept an eye on the dumpster for the next few days just to make sure nothing was going to flare up again. 
Image description
(Back) Up On the Roof
​With approval to re-coat the flat roof on the church’s Wesley Hall, Dave had coordinated the pressure-washing during early March. Now the time had come to apply the paint, which we knew could be a very messy job. The plan was to apply 2 coats, which would require 30 pails of some very heavy paint. Dave was concerned that it be delivered to the roof directly, since hauling it up by hand would be difficult. The truck delivering it made it look very easy, using a long arm to move the pallet up to the roof. With Dave’s help, a worker dispersed the pails around the roof, to spread the weight.  
Image description
​A couple of days later, the application work began. With 3 hired workers, the paint company’s representative and Dave on the roof, the first coat went on smoothly and was done by day’s end. Luckily the weather was cooperating with both the temperatures and humidity reasonably mild. The 2nd coat took even less time, but there was a little paint left to apply. So, on Friday afternoon, one of the workers returned to finish the job and clean up all of the tools. And it should be 10 years before having to do it again. 
Image description
And Now, For Something Completely Different

Beyond 90 has a sewing class that the church helps celebrate with a Fashion Show each spring. This means a great deal to the class participants, as they and their creations are celebrated on a red carpet. The ladies of the church prepped and cooked all day the day before. Meanwhile Cathy helped with the decorations, teaching Jose how to deploy the stage curtain, working with Lori on the sound and video presentation and washing the tablecloths that hadn’t aged well in storage.

Dave’s contribution was perhaps the most appreciated. The recently-replaced kitchen A/C was not working on one of the hottest days in months. With ovens going all day, the temperature kept rising. Dave made a call to the HVAC company and they came the next morning to get it working. The bad news was that we had been the cause of the problem. In the process of re-installing the light in the kitchen, we moved the drain line so that the condensate was not draining properly. Oops.  
Image description
Fred’s work in resurrecting the grill was put to good use, as Pastor Michael grilled chicken skewers on the day of the event. And the sold-out event was a huge success. Thanks to a huge amount of preparation from the ladies of the church and Beyond 90, the participants felt celebrated and the attendees had a great time. 
Image description
And There’s More

​Sandy came to Faith as she was making her way from one Nomads project to another. During her time at Faith, she kept busy and we appreciated what she accomplished. She stained some ramps, pressure-washed sidewalks, deep-cleaned the shower and an enclosure, and did some painting – things we would not have had time to get to.  

​
Image description
And Fred and Pat had left one thing to be done that we managed to finish up. A small bathroom in Kim’s Open Door had not been used much because it was in an enclosure without a ceiling. Not enough privacy. We managed to fit a piece of drywall over the “room” to make it more soundproof. And Kim’s staff was thrilled.
Image description
Cabin Work Week 2025
Looking forward to the fall, we’ve had some discussions with the staff at Pocahontas State Park. We’ve decided to have a final Cabin Work Week this year, and are working with the park to plan this final event.   
Image description
Parting Shot
​
​Cathy unearthed this little fellow – a blue-tailed skink – in her efforts in the field. 
Published on
Image description
With just 2 weeks left of Pat and Fred’s time at Faith, we tried to make the most of it with some last minute projects (and a few bike rides). The big project for Pat and Cathy was a floor repair in the custodian’s apartment. And, despite being pulled in several directions, Dave helped Fred with some projects, from electric breakers to a gas grill hookup and continued to make progress on the Wesley roof. 
Image description
Floor Moving
​The floor looked a little like a checkerboard – so many of the wood laminate planks had separated across the expanse of the living area. This was the state of the floor when we arrived in Jose’s apartment. In addition, there was a mysterious soft spot in the kitchen in front of the sink. Knowing our time was limited, Pat and Cathy started by removing the planks in the kitchen to understand the reason for the soft spot. And we learned quite a lot.  
Image description
​There were 3 panels that had been cut into the kitchen underlayment to give access to the kitchen plumbing. The one closest to the sink had little support, so it was sinking on one end. We could easily solve that problem, but the access to the plumbing raised a new possibility.

​There had been repeated problems with the kitchen drain clogging over time. A recent plumbing repair trip had removed the clog, but without better access to the drain lines, it was going to happen again. There was an obvious need to simplify the drain line and remove the 90 degree elbows. This was the ideal time to make this happen. So, with the plumbers arriving the next day, Cathy and Pat moved onto the main living room/dining room. 


Normally, these interlocking planks “float”, meaning they are not glued or nailed to the floor, but are locked to each other and designed to move as one unit as they shrink over time. However, our best guess was that this floor wasn’t allow to move as a unit because most edges had been caulked to the baseboard. So, we planned to remove the caulk, and just close the open gaps, moving from one end of the room to the other. We then expected to put small filler pieces in place at the far end of the room. If we encountered a damaged plank, we would use the excess good boards from the kitchen. We planned to put a new floor in the kitchen in a contrasting color.  
Image description
At first, we were thinking we would simply tap the end of each board to close the gaps with a special tool we had purchased. But YouTube revealed a much more ingenious solution.

With a 2x4, some strong double-sided tape, and a mallet, we simply attached the 2x4 to the board to be moved, stood on the board and hit it with a mallet. And the boards started moving into place. We made quick progress  across the room at first, but as we got further from the wall, the effort required to move each board increased. We destroyed a few 2x4’s, switching to a hammer from a rubber mallet, and swapping off as our arms tired. But, by day’s end of the 3rd day, all of the floor’s gaps had been closed.  
​
Image description
We just had to work on the edges, which took most of the next day, cutting and piecing in planks to fill the remaining gaps, and setting up to install transitions in several doorways.  
Image description
​So, over the weekend, we turned our attention to the kitchen, purchasing the new flooring in a grey color that would complement the walls, along with the transitions and ¾ round molding. With the plumbing repairs done, Cathy focused on reinforcing the supports of the kitchen access panels, while Pat worked to install the transitions in the main floor. Cathy also cut the ¾ round molding for all of the walls.  
Image description
​With only 3 work days remaining, we finally began installing the kitchen floor on Tuesday of the 2nd week. We continued to struggle with condensate from the fridge dripping onto the floor, but managed to get the underlayment dry enough to proceed.

​Working from the outside of the bar into the main kitchen area, we cut and lay planks, working to keep them from shifting as we rounded the edge of the bar. This wasn’t completely successful, since we found ourselves backtracking to re-cut planks that no longer lined up with the baseboard.  
Image description
We also had to work around the refrigerator and the stove, which could not easily be moved out of the way. By day’s end, we had the majority of the floor laid. On the final morning, we just had to close some gaps on the edges, and install transitions and ¾ round molding. The results looked pretty good, and Jose was very pleased. We can only hope it will stay in place better than it did in the past.  
Image description
Cleaning Up, Cooling Down, Heating Up

While we had started to power wash the Wesley roof in February, the effort shifted to others as March began. Dave had permission to hire some workers referred by First 90 who would finish the power-washing of the roof in a day and a half. (Pat and Cathy had thought it would take us more than a week.) Their work made it possible to assess the roof, and once that was done the path forward would be to apply another 2 coats of protective paint that would protect it for many years to come.

There would be more work done on the roof, as an AC unit that served the kitchen needed to be replaced. Dave was tapped to remove a kitchen light fixture to open up access, while Fred was recruited to replace a breaker that blew during the install. And while working on electric, Fred replaced breakers for other AC units installed last year that needed to be reduced to better protect the smaller units. Finally, the breaker in our pedestal that had given us trouble early in the year needed to be replaced to get it working again. Dave and Fred managed to squeeze that task in on one of Fred’s last days before heading out. 
Image description
​Then there was that grill. It had been buried in the container for several years, but there was interest in having it available for church functions. Dave and Fred moved it to sit outside of Wesley and connected it to the church’s propane tank. However, getting it working wouldn’t be so easy. The valves all needed extensive work to get them functioning again. Fred meticulously cleaned, greased and repaired each one. When the work was complete, we took the opportunity to buy some steaks to test his work. They tasted great, so it seems the repairs worked well. 
Image description
Cathy and Pat teamed up to clean up some more around campus. They took the last of the accumulated metal to the recycling site and hauled several medical devices to the local non-profit that dispenses them to those in need. There were 10 large bins intended to collect paper for shredding in years past when there was a school on campus. These had been unused and collecting water for several years. Putting them on the side of the road a few at a time redistributed them to others who could use them.

​But the most satisfying removal was a hospital bed that had arrived late last year. The problem was getting it into the right hands. We tried to donate it, but no organization would take it. Cathy researched selling it, but several seemed to languish on Facebook Marketplace. We even considered just scrapping it. However, with Pat's encouragement, Cathy finally decided to put it for free on Facebook. The 2nd inquiry turned out to be  the right one.  A young mother, recently diagnosed with late stage cancer needed to make room for her grandmother to stay with them as she went through treatments. With little time to prepare, the need for the bed was urgent. And then our listing appeared. When she arrived with her husband and kids to pick up the bed, she said her grandmother insisted on giving the church a donation for the bed, she was so grateful. It turned out to be a means of blessing for both of us.
Image description
Cushion Repair
​
Most RV’s the size of ours are not really built for full-timers. So, it wasn’t a big surprise that the cushion where Cathy sits at the table every day was showing its wear. So, the time had come to recover it. We looked for fabric that would hold up to the constant use of our life aboard that we liked. Pat helped give her expertise on what we should be looking for, especially a measure of “double-rubs” that assessed durability. We switched from vinyl to 2 complimentary fabric patterns for the back cushions and seat cushions. Reusing the existing backs and zippers allowed the construction to go quickly. And while the seat backs had a more elaborate pattern that required matching, Cathy was able to successfully keep the patterns aligned. The results are pleasing and should hold up for a few more years.  
Picture

New cushion covers in the RV

Image description
Travels by bike

We returned to the Jacksonville-Baldwin Rail Trail, where we actually had to stop to let a train pass by. And once more rode along the coast on Little Talbot Island. It was a nice end to our shared bike trips with Pat and Fred. 
Image description
More Goodbyes

Pat and Fred were due to head out on a weekend where storms were making their way across the south. They wisely delayed a day to ensure a safer trip. And the irony was that there was one more task for Fred before heading out. A long-delayed battery switch arrived in that day’s mail. So Fred and Dave installed it on the church’s truck and gave Jose a tutorial in using it.  
Picture

Fred walks Jose through the use of the new battery switch

Image description
We had one last fish dinner at San Jose Catholic Church on Friday and the delay in travel afforded a trip to Sonny’s for BBQ on Saturday night. Early Sunday morning after Jose unlocked the gates, Pat and Fred said goodbye to him and Pastor Michael and pulled out to head west to New Orleans. We had enjoyed the time together and the work we got to accomplish. ​
Picture
Image description
Parting Shots

​It was called Lazarus because it had been resurrected from a mere shell of metal 9 years ago. A coat of yellow paint, some serious wiring work, and it was on the road. But over the years, Lazarus needed resurrecting over and over. And by this winter, it wasn’t looking good. So, it was loaded up to head to a vocational school to see what they could accomplish. Not long after it arrived there, it was deemed beyond repair. But it had been put to good use in the 9 years since its resurrection.

Pictures below of Lazarus' better days