Published on
Image description
As the temperatures in Jacksonville climbed, we kept busy with chores that could let us beat the heat indoors. And the church had another transition as we said goodbye to the Interim Pastor Mike on his last Sunday at Faith. 
Image description
Tech Upgrades​

With our extended stay in Jacksonville, Dave had time to purchase and configure a replacement office computer for the church. The old one had been experiencing problems that made it worrisome that its days were numbered. Once in place, we could work through any issues with the transition while we were still here. He also was able to implement a routine cloud backup that was less manual than the process that had been used.

He also wanted to make the office network more secure, so we installed a separate router for the office computers and printer. In the process we learned that the printer configuration was not set up properly, so Dave was able to fix that as well.

Cathy spent several hours on the phone with Comcast to resolve some billing issues. The church had changed the services it was purchasing, but the changes were not being reflected on the bill. After some escalation, she was able to get the credits earned, plus a little for the inconvenience. 
Image description
And other stuff

With no other volunteers on campus, our days’ activities vary greatly, so each day sees us doing lots of different things. One day, we made a trip to the clerk of courts to file some paperwork for the church. On another day it was a trip across town to Ebenezer Methodist to visit the DMV and transfer a bus to them. Cathy spent some time checking out locks that weren’t working as expected, making a replacement along with some keys. With the reorganized space in the containers, she also spent time making labels to mark the new locations of the plumbing supplies.
Image description
Dave worked with Pastor Ricardo to set up the Spanish phone messages and call routing on the new phone system. And they also worked together to descale Pastor Ricardo’s hot water heater, repeating the process we had done on ours a few weeks earlier. ​
Image description
But perhaps the most unusual project we took on was to install a mail slot in the office door. Since the office is only staffed Monday through Thursday, mail deliveries on Friday and Saturday were sporadic. By installing a mail slot, the postal carrier could deliver any day. The mail slot frame was hard to come by, but we found one at the local Ace Hardware. Then, we had to cut the slot out of a section of the door that was 2 inches thick. But we managed to get it cut out and install the frame successfully. And the mail can now be delivered 5 days a week. 
Picture
Image description
Hello Goodbye

One of the benefits of our delayed departure was that we would be at Faith for the transition to their new pastor. Faith’s interim pastor, Pastor Mike, was leaving just before the end of May, and the church was preparing to welcome its new full-time pastor, Pastor Michael (a little bit of confusion there), who would arrive on May 31st. On Pastor Mike’s last Sunday, we said goodbye with a reception after church, thanking him for all that he did to help guide the church during the 5 months of his tenure.

During that next week, we helped prepare for Pastor Michael’s arrival. Cathy updated the church’s website, and Dave coordinated the email transition for the pastor’s email account. On the following Friday which was a sweltering end to the month of May, Michael and Lucie arrived. We happened to be in the office as he dropped off boxes, and later that day we were installing the mail slot as they returned to be treated to a dinner in Wesley Hall. We would have a couple more weeks to get to know them before we would be heading out.

Health Update

Dave’s test results from his endoscopy (mentioned in last month’s update) showed no serious problems, so we were given the green light to head out. It was time to start making plans for travels north to (hopefully) cooler weather.
Image description
Parting Shot

We’ve stayed late enough in Florida that the crepe myrtles have started to bloom.  

Published on
Image description
Back in Jacksonville after a month-long cross-country train trip, we didn’t sit back and relax too long. On the morning we returned, Dave began prep for a test 3 days later, and Butch cornered Dave before he could even set foot in the RV to show what had been done over our month away. With only a few days of overlap before they would head out, we worked together on a few projects that would make a difference here at Faith.
Image description
Train Travels​

Our train trip back from California went very well and we enjoyed the trip back as much as the travel out. We didn’t have any missed connections and the scenery on the new routes was beautiful. We spent a couple of days in San Antonio, a city neither of us had visited before, and took a riverboat trip in New Orleans. After a weekend visiting Cathy’s family in NC, we boarded our last train south from Raleigh to Jacksonville on Sunday night, with only a couple of days to spare for our 30-day USA Rail pass. If you want to see more of trip, you can take your pick of the almost daily videos we posted to share our travels by clicking on the link below.
​
Image description
Sprucing Up

We were asked to spruce up the landscaping around the sanctuary, which was over 200 feet of ground to cover. That required 60 bags of top soil, 80 bags of much, several dozen plants, and running 2 irrigation lines that had to go under 4 sections of sidewalk. Thankfully, we had a younger, stronger back to help with the worst of the digging. The results look much nicer than before, but time will tell how the beds hold up.
Image description
The church has irrigation lines that run throughout the campus. Several years ago, we re-plumbed the source of the water for these lines to come from the church’s well. However, the irrigation zones had not run in several years, and they needed to be tested and repaired before they could be activated again. The controllers needed to be updated as well. With a little help from us, Butch worked his way through the zones and got all of them working again.

Image description
While we were away, Butch had run a new ethernet cable to provide more direct service to Beyond 90, and shortly after our return, Cathy put the ends on the cables to put the new wire into service. We continued to provide support to the office staff when they had computer problems, but the most unexpected call to duty was on Mother’s Day Sunday, when we were asked to run the slides and music for the Spanish service. Cathy’s high school Spanish and some cues from the lay leader got us through it.

While Butch worked on the irrigation system, Cheri worked her way through painting several recently emptied classrooms. We put together a short montage of the work they had done for their final dinner, which was a pleasant surprise for them, but also a reminder of all the things they had accomplished in a few short weeks. On the 3rd Saturday of May, they headed out for Georgia, and we found ourselves as the only ones left in the campground.
Image description
RV Stuff:

Although we arrived in the morning after one of our worst night’s sleep on the train, we had some RV maintenance to attend to that only made sense to do that day. With the hot water heater off and therefore cold, we drained and flushed it, and then let it de-scale with a vinegar solution most of the day. We replaced the zinc anode, which showed it had done its job over the past year, and refilled the tank. By the evening, we had hot water again.​

We had treated the fresh water tank over the month away with bleach, so that had to be drained and refilled. However, before refilling the tank, we wanted to regen the water softener, which required a trip to Walmart to pick up 3 lbs of plain salt to do the job. It takes about an hour to flush the softener, fill it with salt and then flush it again after it has had time to set. That task done, the fresh water tank was filled, and we were back in business. 
Image description
A few days later, we had Shane from One Sec Mobile come to replace the brakes on the trailer. Since he needed the slides in and access to the trailer was limited, we took the time to break in a new generator we had purchased. This was a small one that we opted for just to be able to charge batteries when we were boondocking. It needed to run for 5 hours at varying rpm before an initial oil change. After 5 hours of turning crockpots on and off, we finished the break-in and did the oil change. Since rain was due in a couple of days, Cathy then made a cover for the generator, so it could ride in the back of the truck when the tonneau cover was rolled back. ​
Picture
Image description
Taking Pictures

​One other thing that started the day we returned, was Dave’s prep for a camera endoscopy. He swallowed the camera on Thursday morning and then was fitted with a data recorder, that looked like a tricorder from the first Star Trek series. This was followed by another regular endoscopy a week later, which caused us to miss saying goodbye to Butch and Cheri. However, we decided to go to Whit’s afterward to get some frozen custard, which seemed like a good way to mark the end of the fasting needed for the procedure.