Published on
Image description
Schedules and plans, as most cruisers know, are written in the sand at low tide. It doesn't take much wave action for them to wash away and require us to make new ones. We knew we wanted to make trips to PA and NC to see family. There was also this RV show taking place in Hershey PA (“America's Largest”). We wanted to take Orion for a trip up the bay. And we kept shopping for an RV online and elsewhere. So, we made a plan. First, the RV show. That's on the way to Allentown to visit Dave's Mom and sister. Then back to Hampton. Then to NC for a visit with Cathy's family that would coincide with our great-nephew's baptism. Back to Hampton, where we'd get Orion ready to go out on her trip. Sounds great. And we actually managed to get some of it done. 

Image description
America's Largest RV Show

We've been to dozens of boat shows and, in the last couple of years, a few RV shows. So what does the “Largest” RV show look like? It's held in Hershey PA at the Giant stadium where the Hershey Bears Hockey team plays. However, the RV's are not inside the stadium. They are on 21 acres of parking lot that surrounds the stadium. The stadium building is filled with vendors, and a few venues for seminars. We helped open up the show on a beautiful, crisp September morning, and were dragging ourselves out to the truck in the dark as it was closing down. By this time, our search had narrowed to a particular model of Fifth Wheel – a 25 ft Palomino Puma. Since this is considered very short for a fifth wheel, we didn't find any of this model at the show, but did manage to find one made by a different Forest River make, Flagstaff, that came pretty close. The unit at the show was loaded with extras we didn't really want, and we didn't find their price for a stripped down model too attractive. So, we'd keep shopping.
Image description
In the meantime, we learned about fifth wheel hitches, and the unique problems we have in our short bed truck. We talked to vendors about roofs and how to replace one that is failing (one of the ways an RV can go bad quickly). There were seminars about traveling to Alaska and about maintaining your RV that we managed to squeeze in. Although maintaining our sailboat is a good foundation for maintaining the RV, there are some obvious differences. By the end of the day, we were on overload – armed with more information and also more questions. Do we buy a new one or a quality used one? Do we buy now or in the spring? Which hitch do we get?


However, a week later, Dave stumbled across a new fifth wheel on Craigs List that was almost exactly what we were looking for – a 2015 Palomina Puma 253FBS. After some conversations with the dealer and lots of investigation on the internet, we managed to make a deal. We haven't seen it yet, but it's waiting for us to arrive in a couple of weeks. So, we're one step closer to becoming land cruisers – when we're not on the water.

Image description
Family North and South

After leaving the RV show, we spent several days in Allentown (as planned), and discovered the financial paperwork had slowed to a trickle, allowing us to enjoy the time together with Dave's mom and sister a little more. By Sunday, we were making our way south again to Hampton.


Or not.


Before leaving to head north, Orion's refrigeration had stopped working. It needed a new compressor, which was on order and still delayed. So, we asked each other why go back to the boat. The repair couldn't be done until the compressor arrived. So, we decided to keep driving south and west toward Winston-Salem to visit with Cathy's mom. It didn't hurt that it took us by way of another RV dealer, of course.​
Image description
Arriving in NC on Monday evening, we had almost a full week visit with Cathy's mom, which included some house projects and paperwork. Dave can now say that he has planted collards, which was yeoman's duty, since he is unlikely to want to eat any of their eventual harvest. And Cathy was able to sort through a few financial issues with her mom outside all of the hubbub of the large Christmas gathering. On Sunday, we joined the rest of the family for our great-nephew, Jason's, baptism in Raleigh. After the service we gathered for a festive lunch at Cathy's sister's new home in Raleigh. Grace and John had moved there in September, after having raised their family in Memphis, TN. It was a dual celebration of Jason's baptism and Grace's birthday the day before. As is typical at these things, there was no shortage of good food. And, of course, you would never know that Grace and John had moved in less than a month earlier. The new house was beautiful.
After lunch, we made our way back to Hampton, arriving just before high tide and discovered to our dismay that the finger piers were already under water thanks to several days of rain, the super moon, and the persistent northeast winds. Rather than slosh through the water with our stuff, we took Steve up on a standing invitation to stay at his house. But by Monday afternoon, we were back on Orion. We just weren't going to stay there that long. Thursday afternoon would find her stripped of canvas, battened down for the storm as we headed out of town, pulling Jr behind us.

Image description
Rain, Rain, Go Away

Seven foot tides. That was the early forecast when it was possible that Joaquin would track directly up the Bay. And it wasn't arriving until late Sunday / early Monday. Before then, we were going to have rain and lots of it. That, combined with gale force northeast wind would create coastal flooding by Friday afternoon that would start to rival hurricane Irene from 2011. Orion was likely to be fine. We just needed to strip the canvas and get our stuff off. But we couldn't stay on board unless we wanted to wade to shore. With that much water, the docks would be underwater for most of the day. Then there was Orion Jr which was sitting in Steve's backyard in Poquoson. With the forecasted tide levels, Jr's spot would likely be under water. That meant we had to find another place for her. 

Image description
Unfortunately, it was already too late to get the boats ready “before” the weather arrived. By Tuesday afternoon, it was already raining and wasn't supposed to stop for any significant stretch of time for the next week. That meant taking down canvas in the rain and stowing it wet down below. Fun. Then off to Steve's where we had to get Jr ready to move in the rain as well. Dave put air in all of the tires, while Cathy mopped up all the water down below. (We have had a significant leak that was related to our temporary hatch boards. Needless to say they are not being used anymore.) We put up the flags, replaced the straps with new ones that Cathy had made earlier in the summer. (Good thing.) Once everything was re-stowed down below and secured on deck, we hooked up and made our way to Jarratt and our daughter's house. A hundred miles inland would at least mean we were far enough away from the coastal flooding, if not from the endless rain. And her property gave us a few options for storing Jr.



But it's not looking good for getting Orion out on the bay.

Published on
Image description
We were splitting our time between several boats during the time back in Hampton: Orion, Orion Jr, Bay Dreamer, and our friend Betty's boat, Kanoa. We managed to get a lot done in a relatively short time. As Rat says, there's “nothing half so much worth doing as simply messing about in boats”.

Image description
Pulling out the sewing machine

Our busy summer had caused Cathy to defer several sewing projects that she finally was able to catch up on. The biggest was to make a bimini for our friend, Betty's power boat. Before Cathy could pattern the bimini, we needed to repair a couple of mount points for the bimini frame. Dave managed to find a little starboard to provide the backing for one side mount, and we found the missing hardware for a good price at perfectfit.com. With a little epoxy to fill the old holes, the new mounts allowed us to open the existing bimini. Cathy used this to pattern the new bimini, which fit very well. This is her 3rd time making one, and each time she has learned more and made the building easier. The result looks pretty good, too. It also was a big help to have access to a house to work in (thanks to Sue and Steve), where she could leave the project laid out over the 3 days it took to complete.

Back at Joy's, Steve had asked for a new pocket for Bay Dreamer's starboard locker, and while she was at it, Cathy re-stitched his dodger. Orion Jr has a new grill that needed a cover, and which now has one.  
Image description
Hardware and Software


It was almost by accident that we realized as we were putting Jr away for the season that there was a BIG hole in the box that held the tiller extension handle locked in place. The plastic had simply become too brittle and failed. However, the folks at Forespar were great, sending us a replacement for free. It was an exact replacement, so the work involved was mostly cleaning up the old opening and ensuring it was caulked well when installing the new – a pretty easy install.

Over on Bay Dreamer, Dave helped Steve investigate why his auto-pilot had stopped working. As supervisor, Dave got to send Steve down into the “hole” by the rudder to discover the rudder sensor had slipped out of place. He was also on hand to hellp install clips on Steve's azy jacks to make it easier to disconnect them when he wants to deploy his sun shade.

We had an unfortunate “oops” when we were showing Orion to some prospective buyers. It appeared that one of the AIS cables that connects to the PC down below had failed. This connection is critical to ensuring the AIS at the helm works. Dave ordered a new one, and it was another pretty easy install. Once in place, the AIS on the PC at the helm was working as before.

Last, but not least, Dave had to talk to the city of Hampton about a new boat licensing fee they were implementing. We had received some mail that requested feedback, but it was already late when we received it. The bottom line was that Florida hadn't told VA that we had moved Orion Jr and the portabote to Florida. Once Dave got VA DNR to confirm this, Hampton took them over their books.
Image description
Tri-Service – Again

On a cloudy morning, the first hint of fall after a long, hot summer, we fell in line behind the other sailboats making their way to annual Tri-Service Race, passing the aircraft carrier Eisenhower as we left the Hampton River. We were crewing this year on Bay Dreamer, with Steve as Captain and Linda as first mate. What a difference a year makes. Last year, we drifted backward toward the Monitor Merrimac Bridge Tunnel as the current overpowered the little wind to keep us from even making the start line. This year we had a good 15 knots of wind all around the course, finishing in only an hour and half, as we made the circuit off Fort Monroe, out to Thimble Shoals light and back. It was a lot of fun.

The Tri-Service is a competition between the yacht clubs from the Navy, the Air Force and (what used to be) the Army at Old Point Comfort. The cup had been ours for several years, but was lost in 2014. With much fanfare, we won it back this year, as we hosted the post-race party. There were cheers from everyone, especially our commodore in getting the cup back.
Image description
Parting Shots

When we weren't working on boats, or crewing on boats, we had time to enjoy some dinners with friends and a few visits from Bonnie and Troy and the kids – even one where they arrived by boat after the Tri-Service race. We made it to Busch Gardens one final time for the season as well. But the biggest surprise was a visit from Tarun (a friend from our winter in Marathon) who stopped by Orion in Hampton as she was heading up to Williamsburg.
Picture

Taylor and Troy wave hello.