Once we made it back into the water, it wasn’t long before we were on the move – and moving quickly. We left Deltaville on the 26th of October and were spending Halloween on the sea wall in Elizabeth City. We’ve moved on since then, but this entry will catch you up on how we finally took Orion off her jack stands and set her afloat again after more than 2 months of land sailing and boat projects.
Steering With a Rudder (Finally)
It was becoming a constant topic of conversation. Every time someone asked when we were going to get launched, we would point to the rudder lying on its side beneath the boat and say, “we’re waiting for that to go back on”. Oh, I see was usually the reply. Although it’s possible to steer with the sails, we prefer the comfort of knowing that a turn of the wheel will actually turn the boat. It had been a bit of a rocky road, so we weren’t sure how smooth the final installation would go.
The first little hiccup occurred during the rudder removal. While Orion was still in the Travel Lift bands, hoisted up to allow room to remove the rudder post, a piece of the rudder quadrant broke during the process of removing the pin to drop the rudder. The stainless steel pin had frozen in the cast aluminum rudder quadrant, making it difficult to remove. After reviewing our options for a repair, we decided to have a replacement part machined in Deltaville.
It was becoming a constant topic of conversation. Every time someone asked when we were going to get launched, we would point to the rudder lying on its side beneath the boat and say, “we’re waiting for that to go back on”. Oh, I see was usually the reply. Although it’s possible to steer with the sails, we prefer the comfort of knowing that a turn of the wheel will actually turn the boat. It had been a bit of a rocky road, so we weren’t sure how smooth the final installation would go.
The first little hiccup occurred during the rudder removal. While Orion was still in the Travel Lift bands, hoisted up to allow room to remove the rudder post, a piece of the rudder quadrant broke during the process of removing the pin to drop the rudder. The stainless steel pin had frozen in the cast aluminum rudder quadrant, making it difficult to remove. After reviewing our options for a repair, we decided to have a replacement part machined in Deltaville.
Although the machinist didn't provide estimates, we were given a "ballpark" figure for the work. When the part arrived, it was well-crafted, but we were taken aback when the final cost came in over 3 times the ballpark figure he had given the boatyard. Thankfully for us, Matt helped us with the overall cost of the rudder repair, minimizing the impact of the machined part's cost. With it in hand, we were ready to replace the faulty o-ring and re-insert the rudder. Unfortunately, this process didn’t go smoothly at all. Every attempt to position it correctly was frustrated by the tightness of the opening. The o-ring would roll over as the rudder was inserted. After Matt inspected the process personally, he called for a break.
In preparing a path forward, we did more work on the rudder to hopefully ensure a smoother installation. We polished the stainless steel band that sits just above the rudder until it shone. The boatyard put fiberglass on the post above the band so that the transition from the post to the stainless steel was smooth. The bronze bushing was removed and polished and the opening within the boat was cleaned and polished to ensure it was smooth with no obstructions. The first attempt to install the o-ring had nicked it, so we ordered another, but it had to come from France.
A couple of weeks later, the prep work was completed, and the o-ring was in hand, so a second install was scheduled. This attempt proved more successful than the first. However, the approach was completely different. With information received from Beneteau in France, the plan was to insert the o-ring from above. After carefully measuring the distance from the top of the rudder tube to the o-ring’s standard position, a wooden stick was cut and marked to assist in positioning the o-ring and ensure it was at the right location. With 2 people holding the rudder below, Dave on deck to insert the upper pin to hold the rudder and 2 people below decks to insert the o-ring, the installation began again. This time the process worked as planned. The o-ring stayed seated in place. We were golden – or maybe not quite.
Since this was a more unusual installation, Matt insisted the rudder quadrant be installed after we were in the water, so he could check the rudder for leaks and look down into the rudder shaft. He wanted to be able to turn the rudder, but without the quadrant, the wheel couldn’t be used. So, Dave dug out our emergency tiller, which we got to use for the first time. After turning the rudder through its entire arc several times with no problems, we had passed the next hurdle. So far, so good
Since this was a more unusual installation, Matt insisted the rudder quadrant be installed after we were in the water, so he could check the rudder for leaks and look down into the rudder shaft. He wanted to be able to turn the rudder, but without the quadrant, the wheel couldn’t be used. So, Dave dug out our emergency tiller, which we got to use for the first time. After turning the rudder through its entire arc several times with no problems, we had passed the next hurdle. So far, so good
We deployed the emergency tiller for the first time to test the rudder, and we were glad it just cleared the box for the generator.
We just had to have the rudder quadrant installed and then the take her out for a sea trial. The quadrant was on that afternoon, and we headed out the next morning for the sea trial. It looked good. No water by the rudder. We decided to head out for Mobjack Bay for the night. But only an hour out, we had to turn back. Water was coming in, and much faster than it had in the past (although not so much that we were in any danger). Once on the service dock, it didn’t take long to discover the likely cause. A rubber fitting at the top of the rudder sleeve apparently needed to be inserted into the sleeve before the quadrant was secured.
With this change in place, we were ready for another sea trial, which we tried the next day. But the conditions were flat calm and even with the assistance of the boatyard’s deadrise Jacqui Ann making waves, Orion was gliding smoothly through the water. Ironically, we were going to have to wait for worse conditions. When these arrived on Monday, Orion bounced through the waves without a drop of water leaking in. We were getting more confident that the problem was solved. We took a 2 hour ride out to meet Marianna coming in from her trip down the bay, with similar success. Looking better. Each day’s travel builds confidence in the repair, but when do you say that for sure? In the meantime, we keep checking the rudder once an hour while underway.
Jacqui Ann, the boatyard’s deadrise had some problems while attempt to wake us during our sea trial, so Orion did her first tow.
Finishing Up and Heading Out
We had a few smaller projects to complete before heading out that were best done while we were at Deltaville. We had another section of caprail replaced under the port bow cleat, ensuring the spacer holding the cleat was once again replaced by one made of fiberglass-reinforced plastic, instead of stainless steel, to prevent the teak from splitting again. We also replaced the cleat in the process. Cathy then stripped the entire caprail and applied 3 coats of Cetol Natural Teak. With the damaged wood repaired and the new finish, the caprail looked the best it had in years. The final project for the boatyard was to tune the rigging once we were in the water. We hoisted the headsail again at the same time and furled and unfurled both sails to ensure they were still moving smoothly after the mast work. Cliff gave us some tips for making this job easier as well. Dave took some time to wire up the 2nd LED cabin light, giving us another extra bright light in the Main Saloon.
With some final provisioning done, and now that Marianna had caught up with us, we were ready to move south, and pretty much on schedule despite the delay at getting back in the water.
With some final provisioning done, and now that Marianna had caught up with us, we were ready to move south, and pretty much on schedule despite the delay at getting back in the water.
Ahead of the Pack?
We left Deltaville on Tuesday, October 26th originally heading only for Mobjack Bay. We were still checking out the rudder for leaks and we had left later in the morning after a brief tour of Deltaville with Pat and Fred. However, we were making such good time, we decided to head for Hampton instead. We made it in well ahead of sunset and tied up on the public piers for a couple night stay. The public piers and the anchorage was full with boats staging for a trip south down the ICW and those preparing to leave for the Caribbean 1500 on Nov. 2nd. We left on Thursday for the free docks in Great Bridge, casting off just before sunrise and making it through the 11:30am lock opening along with 14 other boats. (We had come through the Gilmerton bridge at 10:30 with 17 other boats in what turned out to be about a 10 minute opening. We were shocked.) The dock was empty when we arrived, but that didn’t last. By 1pm, the dock was full and boats began tying up to the trees on the north wall of the canal.
Since we were ahead of the Nov. 1st date, the only thing we could figure is that boats were worried about the announced restrictions in the Gilmerton Bridge schedule that started on Friday. However, we learned that day that the restrictions applied only to large commercial vessels, not small boats like us.
We left Deltaville on Tuesday, October 26th originally heading only for Mobjack Bay. We were still checking out the rudder for leaks and we had left later in the morning after a brief tour of Deltaville with Pat and Fred. However, we were making such good time, we decided to head for Hampton instead. We made it in well ahead of sunset and tied up on the public piers for a couple night stay. The public piers and the anchorage was full with boats staging for a trip south down the ICW and those preparing to leave for the Caribbean 1500 on Nov. 2nd. We left on Thursday for the free docks in Great Bridge, casting off just before sunrise and making it through the 11:30am lock opening along with 14 other boats. (We had come through the Gilmerton bridge at 10:30 with 17 other boats in what turned out to be about a 10 minute opening. We were shocked.) The dock was empty when we arrived, but that didn’t last. By 1pm, the dock was full and boats began tying up to the trees on the north wall of the canal.
Since we were ahead of the Nov. 1st date, the only thing we could figure is that boats were worried about the announced restrictions in the Gilmerton Bridge schedule that started on Friday. However, we learned that day that the restrictions applied only to large commercial vessels, not small boats like us.
On Friday, we headed out to Coinjock on a beautiful warm day. We enjoyed the Friday night band at Crabby’s, while we enjoyed some of their appetizers on Marianna, which was docked just behind the restaurant. On Saturday, we had a great sail up to Elizabeth City, a new port for us. We took 2 of the last 3 spots on the free docks and were grateful to have them, since the winds were going to blow pretty hard for the next couple of days.
We took advantage of our couple of days on the dock to tour the town and visit the wonderful Museum of the Albemarle just off the dock. We were glad we manage to work this visit in to our schedule this year.
Friends and Family
With the arrival of fall came some quickly falling temperatures and lots more rain than we had had. We were glad then for the chance to get away for a couple of weekends to visit our grandchildren and participate in some fall rituals with them. We helped pick pumpkins and enjoyed the Hampton Halloween festival. We were endlessly grateful to Steve on Bay Dreamer who picked us up in Deltaville when we couldn’t find a car rental on such short notice for the Halloween Festival. (We had thought we would be in Hampton with Orion.) He put us and 2 of our grandsons up at his house and allowed us to continue what has become an annual tradition of trick or treating in Hampton.
With the arrival of fall came some quickly falling temperatures and lots more rain than we had had. We were glad then for the chance to get away for a couple of weekends to visit our grandchildren and participate in some fall rituals with them. We helped pick pumpkins and enjoyed the Hampton Halloween festival. We were endlessly grateful to Steve on Bay Dreamer who picked us up in Deltaville when we couldn’t find a car rental on such short notice for the Halloween Festival. (We had thought we would be in Hampton with Orion.) He put us and 2 of our grandsons up at his house and allowed us to continue what has become an annual tradition of trick or treating in Hampton.
Joy and Rusty on Slow Dancin’ came to our rescue during the cold snap in mid-October and allowed us to stay at their beautiful new home for a couple of nights and warm up. One of those nights we enjoyed the company also of Tom and Cathie from Interlude and Corning and Tita from Blessed Spirit who were starting out on their journey south.
As we traveled out of Deltaville on our first day out, we were hailed by Fred and Debbie on Early Out, who had just left Deltaville themselves. (They had just installed a new VHF and were shocked to hear Marianna and Orion on the radio, as if they were still in Cat Island.) We met up with them in person at Great Bridge and spent an evening together.
Moving On
We’re continuing to move south, not well ahead of the pack, but hopefully still in the warm weather.
Moving On
We’re continuing to move south, not well ahead of the pack, but hopefully still in the warm weather.
- Published on
There’s a popular song on the radio these days that tells us it’s not about reaching the goal, it’s about working out the challenges to get there – the climb – that keeps us going. If we didn’t enjoy working on Orion, we certainly wouldn’t have enjoyed the past couple of weeks at all. And the work, despite our complaints about it all, does keep us going.
Fixing the Spreader
When we pulled into the boatyard, Dave asked to take advantage of the free rigging inspection from the boatyard’s rigging company, Southern Bay Rigging. We almost made it through without any concerns until Mike checked out the upper spreaders and discovered a crack in the base on the starboard side. Since this point in the rigging is under the most stress, this was a potentially serious problem.
When we pulled into the boatyard, Dave asked to take advantage of the free rigging inspection from the boatyard’s rigging company, Southern Bay Rigging. We almost made it through without any concerns until Mike checked out the upper spreaders and discovered a crack in the base on the starboard side. Since this point in the rigging is under the most stress, this was a potentially serious problem.
So, we ordered a replacement base, but were confused by discussions with the mast manufacturer about a plate that sat under the spreader base that wasn’t original to the mast. Apparently there had been a repair before we bought the boat. When Clifton went up the mast to install it, he found he had to remove the plate, which revealed the original damage.
This generated a bit of discussion between the boatyard and the mast manufacturer about whether the original repair was OK or not. The manufacturer assured us that it was, especially since it was a furling mast, which has an additional channel within it to hold the mainsail, adding another structural support element. So, Cliff went back up the mast to replace the spreader with the original plate and its new base.
The rig will still need to be tuned once we are back in the water and sails are on, and we’ll continue to keep an eye on this spreader for any new signs of wear.
This generated a bit of discussion between the boatyard and the mast manufacturer about whether the original repair was OK or not. The manufacturer assured us that it was, especially since it was a furling mast, which has an additional channel within it to hold the mainsail, adding another structural support element. So, Cliff went back up the mast to replace the spreader with the original plate and its new base.
The rig will still need to be tuned once we are back in the water and sails are on, and we’ll continue to keep an eye on this spreader for any new signs of wear.
Cliff descends from the mast after completing the repair.
Bottom Painting - An Ugly Business
When Orion was hauled after less than a year in the water, her bottom paint was in very good shape. Had we not hauled this year, we would have waited until next year to paint the bottom. However, since we did haul out this year, it made sense to paint the bottom again.
When Orion was hauled after less than a year in the water, her bottom paint was in very good shape. Had we not hauled this year, we would have waited until next year to paint the bottom. However, since we did haul out this year, it made sense to paint the bottom again.
We used the same paint, Trinidad SR, and changed the color to blue, so we could tell when it was wearing through. With the rudder off waiting for a repair, Dave noticed some fine cracks in the surface. He was advised to strip the paint off and barrier coat these areas. So, he applied several coats of barrier paint before applying the final bottom paint coat to the rudder. Timing is critical with the final barrier coat, since it has to be a little wet as the bottom paint is applied.
The other area needing preparation was the keel. Being made of cast iron, it always has some areas of rust after being in the water for so long. Dave sprayed Ospho on these to neutralize the rust before painting. As he did this, Cathy taped the waterline and the depth transducer to protect them. Then Dave rubbed the entire surface of the bottom with acetone to remove any oils before painting.
With all the prep done, it took a few hours for Dave to roll on the paint, while Cathy painted around the thru-hulls and jack stands with a brush. The keel was finished the next day, allowing the Ospho to cure 24 hours. Bottom painting is a smelly, messy job, but we were glad to have it finally completed.
The finished job
Cathy - a Seamstress?
We had a couple of small canvas projects to do on the boat, which Cathy reluctantly decided to tackle. Without much sewing background (having come along just after the Home Economics classes were abandoned curriculum), she had little of her own training to draw on, so she relied on the expertise (and equipment) of those around her to get started.
We had a couple of small canvas projects to do on the boat, which Cathy reluctantly decided to tackle. Without much sewing background (having come along just after the Home Economics classes were abandoned curriculum), she had little of her own training to draw on, so she relied on the expertise (and equipment) of those around her to get started.
The first project was a re-design of our helm cover. With the addition of the new nav pod, there was no longer any way to s-t-r-e-t-c-h the existing one to fit. With some Sunbrella scraps obtained from the local canvas shop and a rough idea of what we wanted it to look like, she opened up some seams and pinned and stapled in a new piece of fabric to get the desired shape – something she jokingly refers to as a “hunchback” look.
The second project was a cover for our generator box, which was quickly disintegrating from too much UV exposure. It was on this project that she realized that it was a wise idea to talk to the actual user (Dave) carefully before proceeding. Cathy had envisioned a big cover to go over the whole box. But Dave didn’t want to remove it every time he opened the box. So she decided to make 2 pieces – one for the top and one for the sides-- each permanently attached to the box with Velcro. We ordered sew-on Velcro for the fabric and the stick-on version for the box. With every thing stapled in place, after several fittings, Cathy was able to make sure the cover would fit snugly.
Thanks to Dorothy on Dot’s Way, Cathy was then able to sew the finished product, since Dorothy graciously gave her access to her sewing machine and advice on the sticky problems of sewing it all together.
With her confidence built from these 2 projects completed, Cathy also sewed some new fabric into one of our anchor bags, giving us a spare when the next one wears out. None of the canvasmakers among our readers need worry about any competition coming from Cathy in the near future. Your clients are safe. However, she did feel good to be able to accomplish these small projects mostly on her own.
Thanks to Dorothy on Dot’s Way, Cathy was then able to sew the finished product, since Dorothy graciously gave her access to her sewing machine and advice on the sticky problems of sewing it all together.
With her confidence built from these 2 projects completed, Cathy also sewed some new fabric into one of our anchor bags, giving us a spare when the next one wears out. None of the canvasmakers among our readers need worry about any competition coming from Cathy in the near future. Your clients are safe. However, she did feel good to be able to accomplish these small projects mostly on her own.
Chain, Chain, Chain
For years, Dave has been trying to hook up with another cruiser (or two) who might be interested in splitting a barrel of anchor chain. This would allow a lower cost per foot for both parties, and it would allow us to increase our chain on board from 130 to over 200 feet. He finally got his chance when he happened to engage in a conversation with Roger, another boater who was looking for 250 feet of chain. With that fortuitous encounter, a deal was struck. Since we were at a boatyard, the barrel could be delivered by a freight carrier without problem, and the price, including shipping, for a 550ft chain barrel of ACCO 5/16” G4 was the best they could find.
For years, Dave has been trying to hook up with another cruiser (or two) who might be interested in splitting a barrel of anchor chain. This would allow a lower cost per foot for both parties, and it would allow us to increase our chain on board from 130 to over 200 feet. He finally got his chance when he happened to engage in a conversation with Roger, another boater who was looking for 250 feet of chain. With that fortuitous encounter, a deal was struck. Since we were at a boatyard, the barrel could be delivered by a freight carrier without problem, and the price, including shipping, for a 550ft chain barrel of ACCO 5/16” G4 was the best they could find.
We painted one link red every 10 feet. This wears off eventually, but it gives Dave a guess at how many feet are being deployed as it feeds out.
The order arrived in less than a week and was delivered right to Roger’s boat. Within a couple of days, it had been divided into 300 ft for Roger and 250 ft for us. We marked ours with red paint every 10 feet and then with different colored cable ties to delineate the specific distances. Then Dave spliced 55’ of new 1/2” line to the end. This replaced the 164 ft of 5/8” line that we had used before. With the larger amount of chain on board, we felt that we were unlikely to anchor on the rope part of the rode. This would be primarily used to attach the chain to the boat. With the new chain then attached to our anchor, Dave hauled it back on board. The original chain is now stowed out of the way on board until we find an interested buyer. (Could that be you?)
Charging On
Orion’s battery charging system consists of a 20amp Xantrex charger for shore power, a 55-amp Iota charger for use with the generator, some flexible solar panels, and, of course the alternator when the engine is running. However, none of these devices seemed to do a good job of equalizing the batteries (i.e., increasing the voltage for a period time to dissolve the accumulated sulfur(?) on the plates inside the batteries). So Dave was pleased to discover a Xantrex 40-amp charger on the free shelf at the marina. He was able to successfully install this and was pleased that it now seems to do a good job of equalizing the batteries, sending 15+ volts to a fully charged bank. Its only flaw is that is missing the lights on its display, but our Xantrex 20 Battery Monitor compensates by telling us what it is doing.
Maybe this winter we’ll have less worries about battery power. On second thought, that’s not possible.
Orion’s battery charging system consists of a 20amp Xantrex charger for shore power, a 55-amp Iota charger for use with the generator, some flexible solar panels, and, of course the alternator when the engine is running. However, none of these devices seemed to do a good job of equalizing the batteries (i.e., increasing the voltage for a period time to dissolve the accumulated sulfur(?) on the plates inside the batteries). So Dave was pleased to discover a Xantrex 40-amp charger on the free shelf at the marina. He was able to successfully install this and was pleased that it now seems to do a good job of equalizing the batteries, sending 15+ volts to a fully charged bank. Its only flaw is that is missing the lights on its display, but our Xantrex 20 Battery Monitor compensates by telling us what it is doing.
Maybe this winter we’ll have less worries about battery power. On second thought, that’s not possible.
Seeing In The Dark
The final pieces were put in place to complete the radar installation, when Clifton went up the mast to install the Garmin radome. We then routed the wires through the deck at the base of the mast and connected them in the cabin to the power and Ethernet connections to the chartplotter. Then, the moment of truth. Would the radar display on the chartplotter? Sure enough, we saw that we were surrounded by boats as the orange images displayed on the screen. It worked!
The final pieces were put in place to complete the radar installation, when Clifton went up the mast to install the Garmin radome. We then routed the wires through the deck at the base of the mast and connected them in the cabin to the power and Ethernet connections to the chartplotter. Then, the moment of truth. Would the radar display on the chartplotter? Sure enough, we saw that we were surrounded by boats as the orange images displayed on the screen. It worked!
Other Boat Projects
Dave stumbled across a battery-powered fluorescent light at Wal-mart that he felt would hold our new LED light strip. He wired it into our 12-volt Main Saloon lights so that it is controlled by the same switch. Plus there is a switch on the light itself. Once installed, it worked like a charm and now is sits permanently over the table in the Main Saloon. We can actually read by this light. We like it so much, we’ve already ordered a second to install on the other side of the table.
In her spare time, Cathy re-applied Cetol to the cockpit, but limited it to one coat, since it was in good shape, and we want to eventually switch to the Natural Teak version. We also used the Collinite wax to wax the upper deck surfaces.
And what about FUN?
Yes, we had some time for relaxation. We are surrounded by other boaters, all of whom seem to be scrambling to get done and head back into the water for points south. Dorothy and Glenn on Dot’s Way, who had been our neighbors for several weeks, finally launched on Columbus Day and headed out shortly after. We had a pizza party, with homemade grilled pizzas in the screen room the night before they left. Rick and Carla on Euphoria organized it. They had returned from their summer up north and were hauled to a spot right next to us. They also introduced us to Martin and Kathy on Morning Glory, who joined us to celebrate Rick’s birthday. John and Sue on The Suzanne, who are not cruising this year, came to winterize their boat, sitting just in front of us. They took us on a road trip for breakfast and shopping at Wal-mart in Gloucester. Big times! There are of course, many more, but you get the idea.
So, are you in the water yet?
Sigh! We are still not in the water. And it’s getting COLD! We can only hope to be launched the week of the 19th, but time will tell. We’ll keep you up-to-date.
Dave stumbled across a battery-powered fluorescent light at Wal-mart that he felt would hold our new LED light strip. He wired it into our 12-volt Main Saloon lights so that it is controlled by the same switch. Plus there is a switch on the light itself. Once installed, it worked like a charm and now is sits permanently over the table in the Main Saloon. We can actually read by this light. We like it so much, we’ve already ordered a second to install on the other side of the table.
In her spare time, Cathy re-applied Cetol to the cockpit, but limited it to one coat, since it was in good shape, and we want to eventually switch to the Natural Teak version. We also used the Collinite wax to wax the upper deck surfaces.
And what about FUN?
Yes, we had some time for relaxation. We are surrounded by other boaters, all of whom seem to be scrambling to get done and head back into the water for points south. Dorothy and Glenn on Dot’s Way, who had been our neighbors for several weeks, finally launched on Columbus Day and headed out shortly after. We had a pizza party, with homemade grilled pizzas in the screen room the night before they left. Rick and Carla on Euphoria organized it. They had returned from their summer up north and were hauled to a spot right next to us. They also introduced us to Martin and Kathy on Morning Glory, who joined us to celebrate Rick’s birthday. John and Sue on The Suzanne, who are not cruising this year, came to winterize their boat, sitting just in front of us. They took us on a road trip for breakfast and shopping at Wal-mart in Gloucester. Big times! There are of course, many more, but you get the idea.
So, are you in the water yet?
Sigh! We are still not in the water. And it’s getting COLD! We can only hope to be launched the week of the 19th, but time will tell. We’ll keep you up-to-date.
The order arrived in less than a week and was delivered right to Roger’s boat. Within a couple of days, it had been divided into 300 ft for Roger and 250 ft for us. We marked ours with red paint every 10 feet and then with different colored cable ties to delineate the specific distances. Then Dave spliced 55’ of new 1/2” line to the end. This replaced the 164 ft of 5/8” line that we had used before. With the larger amount of chain on board, we felt that we were unlikely to anchor on the rope part of the rode. This would be primarily used to attach the chain to the boat. With the new chain then attached to our anchor, Dave hauled it back on board. The original chain is now stowed out of the way on board until we find an interested buyer. (Could that be you?)