Published on
Picture
He then handed it over to Deltaville Boatyard’s gelcoat expert, Stanley, who did a beautiful job filling the gouges and restoring the smooth finish to Orion’s starboard side. Even knowing where the damage originally was won’t help you find evidence of it now.   With the repairs completed, we were almost done. Dave had talked to a fellow boater who sung the praises of the effectiveness of Colinite Fleetwax. He had used their heavy duty paste wax product that had resisted the inevitable ICW stain for most of the winter. After then seeing the product survive being acid washed on another boat, Dave was sold. We applied one coat of Colinite’s liquid cleaner wax and then followed with the paste wax. Of course, Orion now gleams, but we’re hoping the shine won’t fade so quickly this year. Time will tell.    

Stripping Down

Image description

Although we have been keeping up with the maintenance of our teak, over time the finish has dulled and darkened, and some areas were showing signs of more significant wear. So, we decided to begin the process of stripping the teak down to bare wood to start with a fresh surface. Since we were going to put in that much work, we decided to switch from Cetol Light to Cetol Natural Teak, which we’ve heard good things about from a number of sources. Cathy started with the swim platform and the side steps, sanding down to the wood, and then applying 4 coats of Cetol. The results made the effort worthwhile.
Picture

Finished swim platform

Image description
With a new, larger chartplotter now installed at the helm, we had displaced one of our Raymarine instruments, which now had to be relocated into a NavPod, mounted onto a metal arm. We purchased the NavPod online, but it arrived with a fixed sleeve that could not slide onto the curved rail at the top of our pedestal. So, Dave began looking for a solution. He finally found it on a website selling bimini hardware. It was a T fitting, that opened in 2 halves with a hinge. It still needed some grinding to ensure a solid fit, but once fitted, the arm was strong.

Now, with all the instruments in place, Dave began to re-connect them to power and to each other. Once Dave realized, with the number and complexity of the connections that would be required, it merited a plan to ensure he didn’t miss anything. With the plan in place, he could order enough of the connectors he needed to ensure the splices would be solid and watertight. Next, we began running the new wires that would be needed, in increasing order of difficulty: first, from the helm to the engine room, second, from the autopilot computer to the engine room, third, from the engine room to the nav station, and finally, from the nav station to the base of the mast.

With the wires run, the next step was to start connecting them and then to test the results. Dave powered up the chartplotter, and then connected it to its GPS. He also re-powered the wind and autopilot and connected their SeaTalk wires to each other. The Garmin would now give us our position, track to a waypoint, and display charts and routes. But one of the advantages we were looking to gain with the new chartplotter was to get AIS information (i.e., position and bearing of other boats) at the helm. So, it felt like a major victory when we connected the AIS to the Garmin and began seeing boats in motion on the Bay. 

But we couldn’t leave the existing instruments behind. Once we had the TriData installed in its new NavPod, we ran the wires down the metal arm and into the pedestal to enable it to connect to power and the other Raymarine instruments. With the SeaTalk connections restored and the new NEMA 0183 connections in place, we were able to view depth, speed, wind, etc. on the MultiData instrument below decks and (for the first time) view the same information on the Garmin chartplotter. (We did have to change a setting on the MultiData to enable the NEMA data to display.) With the exception of the radar, all the instruments were working, with more information at our fingertips. 

That left one more connection to restore: the chartplotter to the PC. However, Garmin confirmed that we would no longer be able to send data to the 5208 from the computer. This highlighted a few of the changes from our existing 172C. The 5208 holds fewer routes and fewer waypoints than the 172C, and it no longer allows the charts to be displayed on the PC using Mapsource software. So, Dave decided to remove the wires that would have connected to the PC. Instead, he invested in multiple SD cards and card readers, since we will now need to use the cards more often to transfer information from the PC to the 5208 and vice versa.

We had a few more connections to make down below before we could have all of our functionality back. The VHF radio wire to its antenna had been disconnected to allow it to be used as a fish wire between the bottom of the mast and the nav station for the radar power and data. Once this was reconnected, we were able to transmit and receive again on the VHF. Then we connected the Garmin to the radio, enabling the radio to display our position again, and ensuring a DSC distress call would contain our position. There was only a small problem with the information that now displayed on the radio. It now had the date and time, but it was showing Jan. 6, with an incorrect time. After some searching, Dave discovered that a setting on the Garmin had caused the date/time to be reset to January 2000 when we connected the GPS. Once Dave changed the setting, the date/time reset to the current date. 

Now, we just need to connect the radar . . .
Image description
Lighting Up

With plans to install a radar dome on the mast, we began looking at the list of projects that we could piggyback onto a trip up the mast. We planned to use the steaming light wires to fish the radar power and data cables down the mast to the deck, so it made sense to replace this light with a steaming / deck light combination. We had made several unsuccessful attempts to replace the 8W incandescent bulb in the anchoring fixture with an LED bulb, so we had been hoping to replace that fixture as well. Also, sometime over the winter, the Windex (an arrow indicating wind angle) had become bent and needed replacing. So, we ordered replacements for the 2 lights, the Windex, and then some LED bulbs for the fixtures (from mastlight.com). Mike, from the boatyard, then mounted them as he climbed the mast to do the radar installation. To make the installation easier, we replaced the anchoring light fixture with the same model. He still had a few problems, since one of the bolts would not release easily. It just convinced us of the wisdom of having someone else install them. 


Of course, the primary reason for the trip up the mast was the installation of the radar mount. Dave had decided to go with one from Kato, which is easier to install because it is made to the specifications of our mast, and comes with a guard to prevent the headsail from being entangled with the dome or the mount. Mike drilled the holes for the mount, and then fed the power and data cables down the mast as Dave pulled them through. He then installed the mount, positioning it for the dome installation – but that would have to wait. Time had run out. Orion needed to be hauled and we were heading out of town the next day.
Image description
Cleaning Up

Orion
needed to be hauled in order to complete the repairs on her rudder, and we were reluctant to leave her in the water as we traveled north to Rochester as the hurricane season started to heat up. So, on the afternoon before we were to leave, she was hauled and we scrambled to clean even the smallest amount of growth from the bottom while it was wet and easy to remove. This would make it easier to do the bottom painting when we returned. Then, with the specter of a tropical storm on the horizon, we decided to do a full storm prep, removing canvas and securing loose items on deck.

 
Cathy took advantage of the removal of all of the glass in the enclosure to clean and waterproof the bimini. She also had the glass in the main windshield, which had been accidentally scratched, replaced by the local canvas maker, Ship’s Tailor, who made quick and economical work of the repair.

Living It Up

After working so hard on Orion, it was a treat to head to Rochester and a surprise 80th birthday party for Dave’s dad. We arrived the day before and spent much of the next day trying to set-up for the party, while keeping the surprise intact. It worked, and he was celebrated in style.
Image description
While in Rochester, we made our annual visit to the dentist, visited with Dave’s family and enjoyed some true Rochester cuisine, such as Italian sausage at Giovanni’s stand in Victor and chocolate almond fudge custard at Don’s Original. Mmmmm. . .

Cathy put Dave’s dad to work part of the time (keeping him distracted from birthday preparations), helping her make a second cockpit pocket. He did a great job, but sewing canvas is not going to be his new hobby.

Moving On

Rochester had the coolest temperatures we had seen all summer, which was a welcome relief from the heat of southern VA, but highs in the 60’s were a little too cool. So we’re ready to head further south in search of warmer weather (but not too much warmer). 
Published on
Image description
We finally cast off the dock lines at Joy’s Marina and headed out of the Hampton River for the last time this summer. We headed north to Deltaville, which will be Orion’s home for the next couple of months, as she gets her annual check-up, some repairs and some sprucing up. But before we took her north, we took a road trip to northern VA for our annual check-ups and to visit with friends while there. 
Image description
Checking Up

For the first time in a long time, we traveled by Greyhound bus, boarding at the nearby Hampton terminal and arriving in DC at the bus terminal a short walk north of Union Station. From there we took Dave’s old commuter route via the Metro and commuter bus to Reston, where we were to stay with Cookie, our former neighbor and on-going friend. 


We like to do a project to say thank you for her hospitality. This time, we dove into the dismantling of a malfunctioning hot tub. Luckily, the weather was cool that day, since it took most of the day to finish the job, reducing it to the size we thought would be acceptable to the trash pickup company.  (It was a little much, but Cookie managed to sweet talk them into taking it anyway.) 
After a Sunday spent relaxing and visiting our former church family, we spent Monday morning at the doctor for routine exams that were thankfully uneventful. After Dave met with his colleagues from CNCS on Tuesday, we headed out Wednesday morning for Hampton, retracing our steps through the Metro and bus system. We took time to meet with our financial planners in DC before boarding the bus home to Hampton.

Water: It’s either too much or too little

As the summer heats up, we rely more and more on Orion’s air conditioning to make life comfortable on board.   Like most marine A/C systems, it uses raw water drawn in through a thru-hull sea-cock as a “heat pump”, extracting its cooler temperature to cool the air. As the air cools, condensate forms and is routed into the bilge, where it must be pumped out periodically or (eventually) the space under the floor would fill with water. So, to ensure the A/C’s efficiency, we need to ensure a steady flow of raw water, and a routine emptying of our bilge. 

Up to now, the raw water flow has been amazingly strong and unaffected by the body of water Orion is sitting in. However, this summer has been wetter than normal, and the Hampton River was churned up more than usual.   We were becoming aware that the flow of water coming out of the A/C thru hull had slowed to a trickle by early August, causing us to shut down the system and flush it out with a hose. This restored the flow, but within days, it was slowing again, causing us to flush it a second time. As it started to slow for the 3rd time, we were glad we were headed to Deltaville. The water flow has been steady since we moved north, with no need to flush it any more. (Knock wood.)
As for the bilge, we have routinely been manually activating the bilge pump whenever the A/C is running. However, our rudder leak prompted Dave to install 2 float switches, to ensure we had plenty of notice of any water coming into the boat unexpectedly. He installed one in the main bilge compartment at the foot of the companionway stairs and the other in the stern next to the rudder assembly. These switches are then wired into a new buzzer that, like the one hooked up to our GPS, will wake the dead when it sounds. Being highly motivated to keep the bilge dry (and the alarm silent), Dave then moved our automatic bilge pump lower in the bilge, so that it will pump the water out before reaching the float switch. It’s been working like a charm, and we’re wondering why we didn’t do this sooner. Sometimes it’s the simple things you miss.

Engine Maintenance

When we arrived in Deltaville, it wasn’t long before John was on the boat checking out the engine. However, he was pretty pleased with what he found and the list of to-do items was small. 

Dave had wanted to change the engine water pump, but had been plagued by a persistent leak when he tried to install the replacement. John explained that this was a sign not of a faulty installation, but of a faulty pump that needed replacing. With that information, we instead replaced the impeller on the existing pump and plan to order a new water pump as a spare.

Over the winter, Dave had been disappointed with the performance of the boat’s alternator in charging the batteries, so John did a check of the alternator and gave it a clean bill of health. He also checked the motor mounts and the mixing elbow. He changed the air filter, the on-engine fuel filter and the on-engine raw water strainer gasket. 

Other than that, the engine was fine. After 2 years of more intense effort on the engine, we were glad to spend our attention (and therefore our money) elsewhere.

Charting a new path
Image description
After much discussion, we decided to install our new Garmin 5208 chartplotter to enable us to display AIS and Radar at the helm. The first decision we needed to make was the new layout at the helm, since the chartplotter has a bigger footprint than its predecessor 172C. Mike from Deltaville Boatyard helped us envision the new layout. With the dissimilarity in the footprints, we decided to lay a piece of starboard over the existing pedestal top to give us a clean surface to work with. The boatyard’s carpenter milled the edges and cut out the holes for the new layout and attached it to the existing pedestal. When he was done, it looked great. 

Unfortunately, it just looked great. We now have to do the tedious work of connecting all the wires to make it work.

The first thing we installed was the new GPS. We mounted this on the starboard side of the companionway, removing the headliner below to attach the bolts and run the wire to the engine room, so it could be connected to the 5208 at the helm. There are still dozens of connections to make to ensure everything will work together before it’s done.
Image description
Family Time

After celebrating our middle grandson’s 3rd birthday, Cathy took the older one to the beach for a few days with her family before returning to Hampton and Grandpa to spend the remainder of his vacation with us on Orion. Droz found crabs, “super” jellyfish, oysters, and all the river wildlife to be exciting, but what he most enjoyed was playing with friends on the dock, whether in Hampton on in Deltaville, where he ended his stay. He got to take his first long sailing trip (where we actually sailed most of the way) with us from Hampton to Deltaville. He even manned the helm for the last hour under motor.
More boat stuff to come

If you’ve been feeling deprived because we’ve had so little to say about boat projects in the past few entries, this and the next entry should satisfy your hunger, since we are already knee-deep in several tasks that will make the next few updates.